New entry to Wayne County Community College District – Northwest Campus.

The main night rendering was used as the official project poster, displayed on campus during the entire period of construction.

Exterior PerspectivesAs-built Photos

WCCCD Guardhouse Remodeling (Livonia, MI)

DETAILSBuzzard Point/Capitol Riverfront Redevelopment – Washington DC – Two phase LEED Gold affordable housing units developed in conjunction with DCRA, overlooking the Nationals Baseball Stadium. Design-assist for glazing, $35 Million construction cost.

Studio Weiss’ role on this project was as a project architect, materials & sustainability specialist, along with the coordination of MEP/Civil team for construction documentation.  Initialized design by ODA (New York).

Website at: West Half | 1205 | Apartments in Washington, DC

_________________________________

YEAR:

2008

SPACE:                                         NUMBER OF UNITS:

500sf                                                                   1

Amenities:

Resident accessible roof & pool access. Private terrace(s), sundeck & cabana, alongside Tesla-shares, combined with a landscaped interior courtyard & dogwalk,  Rooftop lounge designed by Venus Williams, Inc.

Contractor:

Xxx

_______________________________

Exterior Perspectives

Night Render

Day Render

As-built Photographs

Construction  (05.09)

top